Restart of BA, CH, CG switches on 14 Aug 2020

Due to necessary software updates, the switches for buildings BA, CH and CG must be restarted. This will be performed on Friday, 14 August 2020 at about 06:30 am.

During the restart, all devices in the affected buildings will lose their network connections for approx. 10 to 15 minutes. This includes PCs, phones, access control systems and Wi-Fi connections.
The restart should have no other noticeable effect.

The following buildings are affected:

  • Getreidemarkt: Plus-Energie-Bürohochhaus (BA)
  • Gusshausstraße: Institute of Telecommunications (CG)
  • Gusshausstraße: Center for Micro- and Nanostructures (CH)

Please direct questions and problem reports in conjunction with this work to the TUnet approver of your institute or help@it.tuwien.ac.at.