Restart of DA05 and DA06 switch on Monday, 07 Sep 2020

Due to necessary software updates, the switch for floors DA05 and DA06 must be restarted. This will be performed on Monday, 7 September 2020 at about 06:30 am.

The affected floors are the 5th and 6th floor of the green Freihaus tower (DA).

During the restart, all devices on the affected floors will lose their network connections for approx. 10 to 15 minutes. This includes PCs, phones, access control systems and Wi-Fi connections. The restart should have no other noticeable effect.

Please direct questions and problem reports in conjunction with this work to the TUnet approver of your institute or help@it.tuwien.ac.at.